Friday, Nov 27, 2026
  • Login
No Result
View All Result
Newz Daddy
  • Politics
    • Defence News
    • Gujarat Politics
    • Indian Politics
    • World News
  • Business & Finance
    • Markets
    • Companies
    • Insurance
    • Personal Finance
  • Entertainment
    • OTT Reviews
    • Bollywood Movies Reviews
    • Entertainment News
    • Gujarati Movies Review
  • Sports
    • Cricket
    • Football
    • Other Sports
    • IPL
      • IPL 2025
      • IPL 2026
  • Fashion and Lifestyle
    • Fashion
    • Health & Fitness
    • Relationships
    • Spirituality
    • Tourism & Travel
  • Education
  • Daily News
  • About Us
  • Contact Us
  • Politics
    • Defence News
    • Gujarat Politics
    • Indian Politics
    • World News
  • Business & Finance
    • Markets
    • Companies
    • Insurance
    • Personal Finance
  • Entertainment
    • OTT Reviews
    • Bollywood Movies Reviews
    • Entertainment News
    • Gujarati Movies Review
  • Sports
    • Cricket
    • Football
    • Other Sports
    • IPL
      • IPL 2025
      • IPL 2026
  • Fashion and Lifestyle
    • Fashion
    • Health & Fitness
    • Relationships
    • Spirituality
    • Tourism & Travel
  • Education
  • Daily News
  • About Us
  • Contact Us
No Result
View All Result
Newz Daddy
No Result
View All Result

Khavda Project Draws Diljit Dosanjh During His Gujarat Tour

Diljit Dosanjh Toured the 538 sq km Site as Adani Green Develops 30 GW in Kutch.

Newz Daddy Editor by Newz Daddy Editor
27 November 2026
Reading Time: 4 mins read
0
Khavda Project Draws Diljit Dosanjh During His Gujarat Tour

Khavda Project Draws Diljit Dosanjh During His Gujarat Tour

0
SHARES
0
VIEWS
Share on FacebookShare on TwitterShare on LinkedIn
Recent Visitors 4

Khavda Project Draws Diljit Dosanjh During His Gujarat Tour

Diljit Dosanjh Visits Adani’s Khavda Renewable Energy Project, Praises Its Scale

The singer’s visit to Gujarat’s Kutch region brings attention to a 30 GW renewable energy project that has already crossed 11 GW of operational capacity.

Punjabi singer and actor Diljit Dosanjh got a close look at one of India’s largest renewable energy developments during his visit to the Adani Group’s Khavda project in Gujarat’s Kutch district earlier this week.

Standing above the vast fields of solar panels and wind turbines, Dosanjh was impressed by the size of the facility. His reaction was brief: “Bohot Vadhiya (this is too good!)”

The visit took place during the Gujarat leg of his national concert tour. Dosanjh spent time with engineers and workers at the 538-square-kilometre site, where Adani Green Energy Limited (AGEL) is developing a renewable energy project with a planned generation capacity of 30 gigawatts (GW).

The singer was shown how the project operates across a remote and difficult landscape. The site is located around 70 to 100 kilometres from the nearest human settlement, according to information released about the visit.

During the visit, Dosanjh met engineers to hear about the difficulties of building such a large facility in a remote saline region. He also visited the central control room, where officials explained how digital systems monitor the operations of the site.

From a viewing tower, he saw the large solar installations and wind turbines spread across the area. He also planted a sapling at the project site.

The Khavda team presented the singer with traditional Rogan artwork and an Ajrakh-print scarf. Both are closely associated with Kutch’s cultural heritage. Rogan art is a traditional craft in which artists use thick, coloured material to create detailed designs on fabric.

The visit comes as construction continues at the Khavda renewable energy site. Adani Green Energy Limited is developing the 30 GW project across 538 square kilometres of land in Kutch.

According to the company’s October 2026 operational update, the project had reached around 10.75 GW of operational solar, wind and hybrid capacity. This included 10,002 MW generated by AGEL and another 750 MW established for other Adani Group companies.

The project is planned to have 26 GW of solar power generation and 4 GW of wind power generation. AGEL aims to complete the full 30 GW capacity by 2029.

The company has also reported that Khavda is around five times the size of Paris. Its annual report for 2025-26 recorded 9.4 GW of operational capacity at the site as of 31 March 2026. The increase since then reflects the pace of construction during 2026.

More than 15,000 people are currently working on the project, according to the information released about the site. AGEL’s project report puts the planned employment figure at more than 15,200 green jobs.

One of the major features of the Khavda facility is its battery energy storage system (BESS).

By October 2026, the operational battery storage capacity at the site had reached 6.63 gigawatt-hours (GWh). Adani Green Energy reported that this represented more than half of India’s total operational battery storage capacity.

The company describes it as the world’s largest operational battery storage installation at a single location.

Battery storage is important because solar and wind generation depend on weather conditions and the time of day. Solar panels produce electricity during daylight hours, while electricity demand can remain high after sunset. Batteries can store surplus electricity and release it when generation falls, or demand rises.

The Indian government has also identified energy storage as a major requirement for the country’s renewable energy plans. The Central Electricity Authority has projected a requirement of 208 GWh of battery storage by 2030 to support the growing share of renewable electricity.

AGEL has stated that its longer-term storage plan for Khavda is 50 GWh. The existing 6.63 GWh installation is an early part of that plan.

Khavda is being developed at a time when India is increasing its investment in solar and wind power.

According to the Ministry of New and Renewable Energy, India’s non-fossil fuel electricity capacity reached 300.50 GW by 31 July 2026. This included solar, wind, hydro, bio-power and nuclear energy.

The government has set a target of 500 GW of non-fossil fuel-based electricity capacity by 2030. Reaching that figure will require new generation facilities, stronger electricity transmission networks and better storage systems.

The Ministry of Power has also identified grid stability as an important issue as more solar and wind projects become operational. Electricity generated in remote locations must travel through transmission lines to reach cities, factories and homes.

Khavda’s location in the Kutch region makes transmission infrastructure an important part of its development. The project is connected to the national electricity network through high-capacity transmission lines, including 765 kV infrastructure.

According to the project information, the facility is expected to generate enough electricity to serve more than 17 million homes annually when fully developed.

The Khavda project forms part of the Adani Group’s wider plans for India’s energy sector. In 2025, Chairman Gautam Adani announced a proposed investment of around US$100 billion in the energy transition sector over five years. The group’s plans cover renewable power generation, energy storage and related infrastructure.

Adani Green Energy has also set a target of reaching 50 GW of renewable energy capacity by 2030.

For the people of Kutch, the project has brought a large workforce and extensive construction activity to a remote part of the district. Its long-term performance will depend on completing the remaining installations, maintaining the battery systems and ensuring that electricity can be delivered reliably through the national grid.

Adani Group expects Khavda to become the world’s largest power plant across all energy sources by 2029.

For Diljit Dosanjh, the visit offered a look at the scale of India’s renewable energy construction. His reaction, “Bohot Vadhiya”, summed up his response to what he saw at the site. The larger test for Khavda will be how effectively its planned generation and storage capacity translates into a dependable electricity supply for India.

Must Read:

Adani Green Targets 30 GW at Gujarat’s Khavda Site By 2029

Sagar Adani Electrification Plan Highlights Gujarat’s Khavda

Previous Post

What Is Infusion Nursing and Why Does It Matter in India?

Next Post

Grameen Mahotsav Opens at Ahmedabad’s Sindhu Bhawan Today

Newz Daddy Editor

Newz Daddy Editor

Our news is our personal opinion. We do not intend to defame anyone. Newz matters the most. Information that is useful.

Next Post
Grameen Mahotsav Opens at Ahmedabad's Sindhu Bhawan Today

Grameen Mahotsav Opens at Ahmedabad's Sindhu Bhawan Today

You might also like

  • Grameen Mahotsav Opens at Ahmedabad’s Sindhu Bhawan Today
  • Khavda Project Draws Diljit Dosanjh During His Gujarat Tour
  • What Is Infusion Nursing and Why Does It Matter in India?
  • PNG connection Drive Reaches 748 Districts Across India
  • GGEC 2026: Trade and Investment Talks Set for Ahmedabad

Categories

Newz Daddy

Newz Daddy is an English News Portal that covers all latest and breaking news on Sports, Entertainment, Business, Technology, Finance, Fashion, Health and Lifestyle many more news from India and across the globe.

Follow Us

Browse Category

Recent News

Grameen Mahotsav Opens at Ahmedabad's Sindhu Bhawan Today

Grameen Mahotsav Opens at Ahmedabad’s Sindhu Bhawan Today

27 November 2026
Khavda Project Draws Diljit Dosanjh During His Gujarat Tour

Khavda Project Draws Diljit Dosanjh During His Gujarat Tour

27 November 2026
No Result
View All Result

Copyright 2026 newzdaddy.com. All right reserved.

  • About Us
  • Privacy & Policy
  • Terms & Conditions
  • Contact Us
No Result
View All Result
  • Aam Aadmi Party
  • About Us
  • All Indian Trinamool Congress – Party
  • Apply Now
  • Arvind Kejriwal
  • Bhartiya Janta Party – BJP
  • Bhartiya Janta Party Gujarat
  • Board of Control for Cricket in India (BCCI)
  • Congress
  • Contact Us
  • Fédération Internationale de Football Association – FIFA
  • Freebies
  • Home 1
  • Home 2
  • Home 3
  • Home 4
  • Home 5
  • Home 6
  • Mamta Banerjee
  • Policy on Privacy and Cookies
  • Rahul Gandhi
  • Rashtriya Raksha University (RRU)
  • Shri Narendra Modi
  • Shri Rajnath Singh
  • Terms and Conditions
  • The Adani Group
  • The Indian Air Force
  • The Indian Army
  • The Indian Navy
  • The International Cricket Council

Copyright 2026 newzdaddy.com. All right reserved.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
This website uses cookies. By continuing to use this website you are giving consent to cookies being used. Visit our Privacy and Cookie Policy.
Go to mobile version